Tuesday, November 22, 2016

11/20/16 Miami Beach/Belle Island

No pictures today, it was a HUGE work day!
 
  • Installed wiring and control wind generator together, but still need to do the rope around it - Bob
  • Installed new toilet seats - Lynn
  • Re-installed ceiling in aft stateroom after finishing the generator - Bob and Lynn
  • Installed bathroom hoses from sink drain to the thru-hull - Lynn (broke sink fixture for port side...need to purchase new one and finish the job!)
  • Finished waxing the top side of the boat - Lynn
  • Cleaned stainless steel all around the boat (still need to do cockpit - Lynn
 
I am going to be putting the Christmas lights up after Thanksgiving and want to make sure most projects are done on boat first.  It's going to be beautiful!!

No comments:

Post a Comment